Final report – EI-GPN – Partial electrical failure

[featured_image]
Download
Download is available until [expire_date]
  • Version
  • Download 50
  • File Size 1.64 MB
  • File Count 1
  • Create Date April 2024
  • Last Updated June 2024

Final report - EI-GPN - Partial electrical failure

On approach, the crew reported a partial electrical failure and a number of aircraft systems dropped off-line including some necessary for landing.

Jeremy